Full-site design previewPreview forms do not send messages
1Degree Surveillance

For partners serving construction sites

Construction site monitoring that keeps pace with the project

Outsource monitoring for your construction clients with a plan for changing boundaries, temporary equipment and contractor access. 1Degree works with security providers serving US and Canadian sites, with coverage tied to the views and response instructions agreed for each project stage.

Illustration of an Asian operator monitoring camera views of a construction site
Illustration of a construction sites site

The site changes. The plan follows.

Build the monitoring plan around the places and routines that matter at your client’s site.

The working site
Review views as the project moves.
Temporary entrances
Keep changing access points in the plan.
Crews & deliveries
Explain early arrivals and late deliveries.

Choose how we watch
your cameras.

Get a quote
Illustration of a fictional monitoring specialist watching several live camera feeds
Day24/7Night

Watch all day

A real person watches your live cameras, 24/7. If we see a problem, we follow your response plan.

Shared team$25per camera / month

Your cameras and other sites.

Dedicated team$35per camera / month

Only your agreed cameras.

Continuous monitoring
Illustration of an alarm at a warehouse entrance after dark
AlarmVideo check

Check alarms

When your system sends an alarm, we check the video and follow your response plan.

$10per camera / month

60 minutes of staff time per camera each month, shared across your site. Extra time: $0.30/minute.

Alarm verification
Illustration of camera checkpoints at a site gate, yard and loading bays
Scheduled camera round1 Gate 2 Yard 3 Loading bays

Check at set times

We check your cameras at the times you choose and send you a report of what we find.

$0.75per scheduled check

Up to 16 camera views and 5 minutes per check. Minimum: $22.50 per site each month.

Virtual guard tours

Quote the current project stage

For construction accounts, a camera plan is only useful while it describes the site that exists. Mark the current fence, usable gates, plant parking, material storage and active work areas. Assess what is visible with containers, scaffolding and delivered materials in place.

Ask the project contact about the next planned change before defining the monitoring scope. A future phase may need a different view, connection or responder entrance. Separate accepted current coverage from work still required for that phase.

Make changes trigger specific checks

Use a short change register shared by your account lead, installer and project contact. The owner reports the change before it affects coverage where possible; the relevant checks establish whether the affected task can resume.

Construction change-and-retest register
ChangeChecks to repeatHandoff to record
Camera tower movedView, labels, connection and event delivery from the new positionAffected task, test result and accepted restart time
New hoarding or material stackLine of sight to the intended boundary or storage areaObscured area and repair or reduced-scope decision
Gate relocatedCamera map, authorized route and responder directionsCurrent entrance name and receiving contact
Power or network changedExpected outage, fault notification and restored event workflowTechnical owner and who confirms coverage restoration

Keep a disconnected site distinct from a quiet site

Assign an owner for temporary power, connectivity and camera equipment. Confirm how an unavailable view is identified and reported in the proposed setup; do not assume every fault produces an automatic alert. Record the temporary limit, the repair contact and who communicates with your client.

A provider’s operating center may remain available while the construction site cannot transmit video. Restoring a connection also needs a check that the intended view and event path are working. A powered-on camera alone is not acceptance of the complete task.

Put early crews and late deliveries into the account

Capture normal contractor hours and the route for short-notice changes. A temporary exception should identify the area, authorizing role, start and expiry time. Keep the operator’s approved next action clear if the site contact cannot confirm an arrival.

Your installation or equipment partner handles placement and repairs. The monitoring team reviews the accepted views and follows the response instructions. Site personnel or the designated field provider attend. Give them the current usable gate and location reference, not just the postal address.

Launch against a representative night and one change

Before the first coverage period, check the intended route with working lights in their actual overnight state. Run a planned contractor exception and a practice update to a gate label or camera position. The account is ready when the receiving teams can use the revised information and the required functions pass.

Bring the change register to your 1Degree scoping conversation. Unresolved visibility, contact or connectivity problems should lead to a named repair, a narrower accepted scope or a delayed task. Continue that register through the project instead of treating initial commissioning as permanent proof.

Illustrative site view of a construction site

Common questions

Before you bring an account on board.

Can monitoring continue when our client relocates a camera tower?

Reassess the new view, connection and event settings before confirming its coverage. Agree how the affected area is handled during the move and who authorizes the revised scope.

Does the monitoring team supply temporary cameras or power?

Do not assume equipment provision is included. Identify the installer or equipment provider and confirm supply, power, connectivity and maintenance responsibilities during scoping.

How should we handle a crew working beyond the planned finish time?

Use the agreed schedule-change route. The update should identify the work area, expected finish time and authorizing contact, with confirmation that the revised instruction is active.

What would you like
to hand over?

Share your company, client-site mix and coverage needs. Let’s work through the next step.

Illustration of a fictional monitoring specialist reviewing camera views
Your camera setupYour coverage hoursYour response plan